Project in Macau for 8 x Easygen 3500 paralleling using run-up synchronization.
The features of run-up synchronization within Easygen 3500
Used to get several synchronous generators onto load in a very short time
Generators are paralleled by closing GCBs during engine start sequence
In some cases the in-rush current of a transformer may be more than one generator can supply when closing the live generator to the dead transformer